boardwalk

Maintenance of the Sir Richard Haynes Boardwalk

The public is asked to note that minor maintenance work will be performed on the Sir Richard Haynes Boardwalk on November 17th, 2017 from 7 am until 3 pm. The maintenance will involve the redistribution of sand along both the seaward and landward sides of the boardwalk in order to restore the beach areas fronting the boardwalk to their original design widths. The work will span the area of the boardwalk between Rockley/Accra and Hastings Rocks.